Back
NHDOT takes aim at Route 125 traffic with $11.9 million Epping upgrade
Oct 2, 2020
The state is moving ahead with plans for an $11.9 million improvement project designed to ease the growing traffic headaches along a congested stretch of Route 125 in Epping.
The project, now in the design stages, is aimed at improving safety and traffic flow on a 2.9-mile section of 125 through the retail stretch that straddles the Route 101 interchange, from the Brentwood-Epping town line south of the Brickyard Square shopping center to just north of the intersection with Route 87.
0Shares
0Comments
0Favorites
0Likes
No content at this moment.